Providing heating and hot water for a renovated hotel in Cheltenham was always going to be a great challenge from the design stage to installation. All of this installation had to be done whilst the 22 room hotel was undergoing a major refit throughout.
At the same time the hotel was already taking guests in, so the pressure to work effectively and with due respect to the guests was crucial.
With our own plumbers involved the transformation of the heating system was underway and form designing a bespoke housing unit for the Windhager Boiler Units to totally revamping the siting of the water cylinders around the premises, we have now been able to make sure that the hotel is up and ready for when all the rooms are occupied.