CASE STUDY

Air Conditioning Replacement at Currys Bristol ERDC

Currys Bristol AC Replacement

Project Overview

GSM Ltd was awarded the contract for the air conditioning (AC) replacement at Currys Bristol ERDC as part of an upgrade to improve energy efficiency and ensure operational continuity. The project involved replacing aging VRV systems, upgrading electrical supply infrastructure, and optimising HVAC performance in a live working environment.

Challenges and Considerations

  • Live Site Operations: The Currys Bristol ERDC operates continuously, necessitating a phased approach to minimise disruption.
  • Heavy Lifting Requirements: Equipment was lifted onto the roof using specialist lifting methods to ensure structural safety.
  • Coordination of Services: Integration with existing electrical, plumbing, and structural elements required meticulous planning.
  • Tight Timeline: The project was scheduled to be completed before the peak trading period to avoid operational disruptions.

Installation Details

  • Scope of Works:
    • Decommissioning and safe disposal of existing Daikin VRV units.
    • Installation of new R32 Daikin VRV systems.
    • Replacement of all associated pipework, interconnecting wiring, and electrical modifications.
    • Coordination with Chartwell Controls for BMS integration.
    • Full system commissioning and performance testing.
  • Equipment Installed:
    • Indoor Units: Various Daikin FXFQ & FXFA series units strategically placed across ground and first floors.
    • Outdoor Units: High-efficiency Daikin RXYSA series VRV condensers.
    • Control System: Daikin Intelligent Touch Manager with full integration into Trend BMS.
    • Mounting System: BigFoot framework with protective felt mats to safeguard roof integrity.

Key Considerations

  • Environmental & Regulatory Compliance: The installation adhered to UK building regulations, F-Gas requirements, and BS EN 378-1-4:2016 standards.
  • Safety & Fire Protection: All refrigerant pipework passing through fire compartments and was fitted with fire-rated sleeves.
  • Minimal Downtime: A structured out-of-hours power shutdown plan ensured no significant disruption to the facility.
  • Optimised Performance: Energy efficiency improvements were incorporated to reduce operational costs and enhance cooling performance.

Outcome & Success

We successfully delivered the project within the stipulated timeline, with minimal disruption to Currys ERDC operations. The new VRV system significantly improved energy efficiency while providing enhanced climate control. Regular updates and coordination through GSM Ltd’s project management ensured full transparency and compliance with Currys’ stringent specifications.

The AC replacement at Currys Bristol ERDC is a testament to GSM Ltd’s expertise in delivering complex mechanical and electrical installations within live operational environments.

Previous Post
Solar PV Installation at The Coroners Court Gloucester Council
Next Post
Solar PV Installation at Dudley
Similar Articles

In-House
Installers

At GSM Limited, we don’t use outsourced subcontractors. We have a team of experienced and professional installers who have all gone through expert training.

Over 30 Years Of
Experience

We have over 30 years of experience in delivering renewable energy systems as well as heating and cooling systems to both commercial and domestic customers.

Diamond Quality
Partners

Being a Mitsubishi Diamond Quality Partner means we have access to more service features for Mitsubishi products such as 10 Year Warranty.

Can we help with your project?