CASE STUDY

Solar PV Installation at Malvern Splash

Leisure Centre Solar Panel Installation

Malvern Splash Solar Panels Installation

GSM Ltd was commissioned to install a state-of-the-art solar PV system at Malvern Splash, a popular leisure facility. This project was part of Malvern Hills District Council’s commitment to sustainability and reducing energy costs. The installation aimed to significantly lower the facility’s carbon footprint while ensuring long-term financial savings.

Main Installation: Malvern Splash

  • Number of Panels Installed: 2 x Solis 110k G5 solar inverters with supporting solar PV system
  • Installation Duration: 3 weeks
  • Annual Electricity Generation: Estimated at 140,000 kWh
  • Annual Carbon Emissions Reduction: 29,960 kg CO₂
    • Equivalent to planting 1,360 trees per year
  • Annual Cost Savings: £35,000 (based on an average commercial electricity price of 25p/kWh)

This installation ensures that Malvern Splash benefits from sustainable energy, reducing its dependence on grid electricity and enhancing overall operational efficiency.

Additional Benefits

  • The system integrates seamlessly with the facility’s existing infrastructure.
  • Helps Malvern Hills District Council meet its carbon reduction targets.
  • Provides a model for future renewable energy projects in the region.

Impact and Future Outlook

The Malvern Splash Solar Panels system stands as a prime example of how leisure facilities can embrace renewable energy to reduce operational costs and minimise environmental impact. This project not only supports Malvern Hills District Council’s sustainability goals but also demonstrates GSM Ltd’s expertise in delivering high-quality solar panel installations.

This aligns with the UK Government’s Net Zero Strategy, supporting national goals to reduce carbon emissions across the public sector.

If you’re looking to reduce your energy costs and enhance your sustainability efforts, contact GSM Ltd today to discuss your renewable energy project.

Previous Post
Solar PV Installation at Gloucestershire Archives
Next Post
Solar PV Installation at The Coroners Court Gloucester Council
Similar Articles

In-House
Installers

At GSM Limited, we don’t use outsourced subcontractors. We have a team of experienced and professional installers who have all gone through expert training.

Over 30 Years Of
Experience

We have over 30 years of experience in delivering renewable energy systems as well as heating and cooling systems to both commercial and domestic customers.

Diamond Quality
Partners

Being a Mitsubishi Diamond Quality Partner means we have access to more service features for Mitsubishi products such as 10 Year Warranty.

Can we help with your project?