Windrush Leisure Centre leading by example. . .

Windrush Leisure Centre Solar Panel Installation

GSM completed the installation of a 186 kWp solar panel system at Windrush Leisure Centre, which includes a ZS-meter swimming pool, gym, fitness studios, and sports hall.

Featuring 356 high-efficiency 530W solar panels, this renewable energy system will save the centre an estimated £44,576 annually and reduce its carbon footprint by 41.5 tonnes of CO₂ each year.

By adopting solar power, Windrush Leisure Centre lowers energy costs and leads the way in integrating sustainable technology into community facilities.

Overview

  • A cost saving of £44,576.00 a year
  • Cutting 41.5 tonnes of CO₂ emissions a year.
  • Produces 178,302.6 kWh a year
  • 356 x 530 W solar panels + 2 inverters
  • 1 week to construct

Learn more about solar here.

Previous Post
Future-Proofing: Growth Hub Tewkesbury’s Carbon & Energy Workshop with GSM
Next Post
Eastington School Shines with Solar PV
Similar Articles

In-House
Installers

At GSM Limited, we don’t use outsourced subcontractors. We have a team of experienced and professional installers who have all gone through expert training.

Over 30 Years Of
Experience

We have over 30 years of experience in delivering renewable energy systems as well as heating and cooling systems to both commercial and domestic customers.

Diamond Quality
Partners

Being a Mitsubishi Diamond Quality Partner means we have access to more service features for Mitsubishi products such as 10 Year Warranty.

Can we help with your project?